Lighthouse — Sea Breeze
04Lighthouse 2

Lighthouse · Lighthouse 2

Lighthouse 2 — the second phase

A neighborhood under construction with 16 eight-story buildings next to the first phase. Sales have been under way since November 2023, and handover is planned by the developer for 2027.

AStatus

Status as of 18.09.2026: under construction

This is not a working neighborhood but a construction site with sales under way. Part of the infrastructure is already open — in summer 2026 the NOMA coffee shop and the Sea Breeze Store started operating in Lighthouse 2 — but the courtyard with a pool, the SPA, the fitness center and the restaurants exist for now only in the developer's renderings.

How many buildings have already been handed over is not officially reported.

16buildings of 8 floors eachseabreeze.az, “Real Estate” section, read on 18.09.2026
2,010apartments and 16 penthouseswebsite — 2,010 apartments; presentation, August 2026, p. 74 — plus 16 penthouses
40–383m², apartment floor areaspresentation, August 2026 and korter.az — from 40 m²; the resort's website — from 41 m²
2027handover per the developer's planseabreeze.az: “Handover 2027”; bina.az and korter.az say 2026
The Lighthouse 2 construction site, 2025: building frames by the sea
The Lighthouse 2 construction site, 2025: building frames by the sea
Lighthouse 2 in September 2026: a street between the buildings, facade finishing still under way
Lighthouse 2 in September 2026: a street between the buildings, facade finishing still under way
BWhat is known

What We Know

Finishing, buildings and timeline

What the Sources Say

  • Buildings 1–8 and 10–16 are handed over in shell condition, while building 9 comes fully finished (presentation, August 2026, p. 74). This means sales are under way for all buildings, but not that all of them are complete.
  • Part of the complex is already working: in summer 2026 the NOMA coffee shop and the Sea Breeze Store opened here (seabreeze.az news item, August 6, 2026).
  • The developer's video of September 9, 2026 shows standing building shells with floor slabs and unfinished interiors inside the apartments (“from 70 to 335 m²” — captions in the video).

What remains unclear

  • How many buildings have already been handed over and how many are under construction is not officially reported.
  • Handover date: 2027 per the resort's website; 2026 per bina.az and korter.az; korter.az writes “one building is under construction, the next handover is in 2026.” The sources differ.
  • The promised courtyard with a private pool, the SPA, the fitness center and the restaurants can for now be seen only in the developer's renderings.

According to the presentation, nearby: a school, a kindergarten, a water park, an amusement park, a medical center, an art center.

The developer's rendering: the Lighthouse 2 courtyard with a long pool — this is what it should look like after handover
The developer's rendering: the Lighthouse 2 courtyard with a long pool — this is what it should look like after handover. This is a render, not a photograph.
The developer's rendering: the Lighthouse 2 buildings and pools from above
The developer's rendering: the Lighthouse 2 buildings and pools from above. This is a render, not a photograph.
CSales

Sales

How the buildings were opened for sale

  • November 1, 2023

    The start of Lighthouse 2 sales.

  • January 17, 2025

    Buildings 2 and 4 went on sale, without finishing.

  • January 31, 2025

    The “third building” went on sale, without finishing; a private pool and sunny terraces are promised.

Purchase terms — how they have changed

March 2026A down payment from 30%, an interest-free installment plan of up to 24 months, up to 36 months for 1+1 apartments and larger; studios — a down payment from 50%. The International Women's Day (March 8) promotion promised “a down payment from 8%.”Source: seabreeze.az news item, March 1, 2026
November 2025A mortgage of up to 10 years; the developer in the news item is Nardaran Invest.Source: seabreeze.az news item, November 12, 2025
September 2026Installments — 30% upfront and 24 months; a mortgage — a 15% down payment over 10 years.Source: bina.az, read on 18.09.2026

The resort's sales department works daily from 10:00 to 18:00 (per bina.az). In the main Sea Breeze sales office stands a 21-meter model of the resort. We did not find a separate Lighthouse 2 office.

We do not sell apartments

The guide is not affiliated with the developer and does not take applications. Check terms and availability with the resort's sales department — we only show what open sources have written about it and when.

DPrices

Prices

What listing platforms have published

The resort does not publish its own prices on its website. Everything below is figures from listings and aggregators, with the date on which they stood there. This is not an offer or a guarantee: the figures changed over the year.

September 10, 2025from 3,570 AZN per m²Source: korter.az
September 10, 20252-room 69.9–83.3 m² — from 255,485 AZN; 3-room 83.7–169.2 m² — from 305,923 AZNSource: korter.az
September 1–17, 2026 (listings)from 255,500 AZN; 2-room from 255,484, 3-room from 277,652, 5-room from 1,529,685 AZN; shell conditionSource: bina.az
September 2026example: a 2-room apartment of 74 m², 5th floor of 8 — 264,180 AZN (3,570 AZN per m²)Source: bina.az
September 2026example: a 3-room apartment of 197.9 m², 8th floor — 773,789 AZNSource: bina.az

Discrepancies in the figures

  • Minimum floor area in Lighthouse 2: 41 m² on the resort's website, 40 m² in the presentation and on korter.az.
  • Lighthouse 2 handover: 2027 per the resort's website, 2026 per bina.az and korter.az.