Lighthouse · The neighborhood
Four buildings, a courtyard with pools, the upper-floor terraces, a sports club in building 4 and twelve points on the timeline — from the first video report on construction to the openings of 2026.

The Lighthouse neighborhood and the resort's shore from above: buildings on the left, beach pools by the sea
The buildings
A premium residential complex on the Caspian shore: four eight-story buildings with mirrored facades and stepped tiers of glass loggias. Every apartment has a balcony with a view or a panoramic terrace.
Source: seabreeze.az, “Hotels” section (Lighthouse card, read on 18.09.2026)Apartments were handed over with full finishing. In the resort's hotel catalog, Lighthouse is marked “Apart-hotel” and has a button for booking accommodation through the resort's portal.
There is no official handover year. According to the developer's videos: monthly video reports on construction ran throughout 2018, in October 2019 concrete was being poured at night on the frame of the first building, and in 2022 the next building was under construction beside a finished one (the Lighthouse 4 building — per the reports from October 2022 to January 2023).
The architect of Lighthouse is not named in open sources. According to the Sea Breeze website, the author of the master plan for the whole resort is Darren Comber (Scott Brownrigg).




The courtyard
The courtyard of the neighborhood is a long pool along the building, sun loungers and umbrellas, a lawn in front of the entrance and an alley of palms between the buildings. From above it is clear that the buildings stand right up against the villas with red roofs.






The upper floors
On the upper floors the steps turn into open terraces: wooden slats along the edge, glass railings and a view of the neighboring building and the courtyard.



Sports
Crocus Fitness Lighthouse is a sports complex in the Lighthouse 4 building: a gym, a lap pool, a group-class studio and a relaxation area; the heated open-air pool operates year-round.
3,500 m² per the Sea Breeze news item, 3,000 m² per the chain's website — the sources differ.
The address from the resort's news item: Nardaran, Damiryol St., Lahij Gardens, the Lighthouse 4 residential complex.
Source: seabreeze.az: the opening news item of 8.06.2024, the master-class news item of 6.02.2025, the “Infrastructure” section



Timeline
There is no official Lighthouse handover year either on the resort's website or in the presentation. Everything known about the construction has been gathered from the developer's monthly video reports and the resort's news.



The developer's first video report on the Lighthouse construction; after that, reports come out every month throughout 2018.Source: the Sea Breeze Real Estate channel on YouTube, the “Lighthouse — Video Report” videos
The start of sales of Lighthouse apartments.Source: Sea Breeze presentation, August 2026, p. 19
A night drone shot: floor slabs are being poured on the frame of a building; the video's intro shows the LIGHTHOUSE · Sea Breeze Resort sign.Source: the video “Lighthouse construction process, drone footage,” 26.10.2019, CC BY
The video “Completion of construction work on the Lighthouse 2 project”: here “Lighthouse 2” is the second building of the first phase, not the present-day complex of 16 buildings.Source: Sea Breeze Real Estate, 25.09.2022, CC BY
Reports on the construction of the Lighthouse 4 building — the one where Crocus Fitness would later open.Source: the videos “Lighthouse 4 — Construction Progress”
The family fitness club Fitness by Emin Agalarov opened in the Lighthouse residence, 3,000 m².Source: seabreeze.az news item
The start of sales of the second phase — Lighthouse 2.Source: seabreeze.az news item “Lighthouse 2 is already on sale”
Crocus Fitness Lighthouse opened in the Lighthouse 4 building: 3,500 m², a heated open-air pool year-round and an indoor pool.Source: seabreeze.az news item on the opening of three projects
COP29 conference guests are staying at Lighthouse.Source: seabreeze.az news item, 11.11.2024
The first major tenants appear at Lighthouse Mall: Bravo Premium (June 6) and, from indirect evidence, İrşad Electronics (June 25).Source: seabreeze.az news item on the openings of the first half of summer 2025; Wolt
The Emporium department store and Emporium Café opened at Lighthouse Mall.Source: seabreeze.az news item “Emporium opened at Lighthouse Mall in Sea Breeze”
Bowling Club, Kids Play Area, My Kids Cafe and the 15/25 Studio salon opened in the mall; in Lighthouse 2, the NOMA coffee shop and the Sea Breeze Store.Source: seabreeze.az news item, August 6, 2026
According to the developer, prices at Lighthouse have risen “by up to +105%” since sales began. This is the developer's advertising figure; there is no independent verification.
Source: Sea Breeze presentation, August 2026, p. 19In November 2024, participants of the COP29 conference were housed at Lighthouse, among other neighborhoods of the resort.
Source: seabreeze.az news item about the first day of COP29, November 11, 2024